Complete Four-Laning Of Numaligarh-Dibrugarh NH Stretch Soon: Sonowal Directs Officials

Assam Chief Minister Sarbananda Sonowal during an inspection of the construction work of the four-lane national highway 37 at Teok on May 4, 2019.
Assam Chief Minister Sarbananda Sonowal during an inspection of the construction work of the four-lane national highway 37 at Teok on May 4, 2019. Photo courtesy: Twitter

Guwahati, May 4, 2019

Assam Chief Minister Sarbananda Sonowal on May 4th, 2019 the directed National Highways and Infrastructure Development Corporation Limited (NHIDCL) to complete the construction of the four-lane national highway 37 from Numaligarh to Dibrugarh at Teok at the earliest.

During the inspection at of the ongoing construction works of the four-lane highway at Chenijan, the chief minister said, “Rainfall cannot be an excuse for the delay in construction work. It should be completed at the earliest.”

“Rainfall remains for most of the time of the year in Assam. That does not mean that we will slow down the works. The construction and repair works should go on in full swing and be completed as soon as possible,” Sonowal added.